Examples of houses already built

showcase_11 website formaat   showcase_12    105 102 98 94 97 90 89 84 87 82 79 76 72 75 71 70  67    56 54 49 50 47 45 38 41 36 32 30 27 32 30 27 30 32 36 38 41 45 47 49 50 54 56 57 58 62 64 67 68 70 71 72 75 76 79 82 84 87 89 90 94 97 98 102 105 showcase_8 website formaatshowcase_26 website formaatshowcase_23 website formaat

Eurologs again designs a beauty

Click here for an animation in 3D:

3D animatie Huize DN

2nd Chalet is ready

Our 2nd chalet in Switzerland was ready by the end of 2012. It is once again a brilliant result. Below you’ll find some photos.

2012-12-6 website formaat

attachment (1) Websiteformaat

attachment Websiteformaat

Construction of (recreation) home goes well

The construction of the a wonderful (recreation) home in Limburg, Netherlands, progresses steadily:

Achterzijde woning website formaat

Zijkant woning website formaat

More progress building vacation home in Switzerland

We already announced it by the end of July: the building of the second recreation home in Mürren Switzerland progressed. Underneath you will find a short impression of this progress from the ‘beginning’ up to now.

vloer 2e chalet in Muerren website formaat

Daklaag erop website formaat

22 juli 2012 zijkant  website formaat

Isolatielaag 1 op dak websiteformaat

isolatielaag 2 op dak website formaat

zijkant verder af website formaat

zijkant nog verder af website formaat

22 juli 2012 bovenkant website formaat

De Lage Kempen almost ready

See here a collage of photos of the finish on both the outside and the inside of the building (restaurant) of de Lage Kempen::








Cedar wood in Switzerland

Underneath you will find a photo collection of the building process of one of our cedar wooden houses (Chalets) in Switzerland. The pictures are in chronic order, starting with the sketch design first, followed by the building process and ending with the final result:

Huis in Zwitserland

The laying of the Foundation and the storey floor:

Fund14

The building process progressed rapidly:

Murren foto 1

All sort of transportation was used in order to get the building material high up in the mountains, at the construction site:

Grutsch zonder datum
Luckily the weather was fine, so the building process of the complete outside of the house only took 2 weeks maximum. After that, we could start finishing the inside.

Murren foto 2

Working on the roof:

Murren foto 3

After this, people worked on the inside of the house, and some results were ready to show:

lwrMurphydown

But also on the outside, the walls and roof were finished in order to have a beautiful result:

2011-8-10

.

Foto 1 website versie huis in Muerren januari 2012

The final actions were taken to decorate the interior of the house, to be ready for living and renting. In springtime 2012 a second Chalet will be built for the same family:

foto 4 website versie huis in Muerren januari 2012

The result looks very nice:

foto 2 website versie huis in Muerren januari 2012

and

DSC02769

and

foto 3 website versie huis in Muerren januari 2012..

.

Building a house in Almere

Monday, July 3rd 2011 we started with the building of a cedar wood house, that was designed by our client themselves. By the end of June the containers have arrived from Seattle. The foundation for this was made prior to that. The building can start now.
Foto 1
First, we the starting profiles (the first layer) were constructed on the concrete foundation.

Foto 2

After that, the first layer of cedar wood timber was placed on the starting profiles. After this, we stacking can begin.

Foto 3

After the first layer is ready, stacking is ‘child’s play’.

Foto 4

And so it is good to see how the stack work progresses, so that at the end of the day the walls of the ground floor are already built.

Foto 5

During the day, the first living store, became stacked. Below you will find a number of photographs to indicate how fast our pile construction went.

Foto 6

With the patented construction system is actually ‘child’s play ‘ to build your own house.

Foto 7

And in a few days time, your home is built. The picture below gives a good view of the end of the first day of construction:

Foto 8

This photograph also shows what can be achieved in one day:

Foto 9

The first construction day comes successfully to an end. Tomorrow we can start with the second floor.

Foto 10

After a good night sleep, we’ll start building the next floor.

Foto 11

We have worked hard to get everything in the right place.

Foto 12

And the result may be seen. A nice ceiling/floor on which the two layers above the ground floor can be built.

Foto 13

After finishing the first floor, the second and last floor will be constructed. Of course we will start with the deck as well.

Foto 14

We will start with a sort of plastic layer.

Foto 15

On that plastic layer the deck will be finished. In the mean time, all windows and doors will be placed and the house is getting ready.

Foto 16

The balustrades of the roof terrace are fitted. The house can now be completed.

Foto 17

Foto 18

Cedar in Switzerland

Our American supplier builds a second home for a customer in a town called Mürren in Switzerland. In this wonderful, natural surrounding in the Swiss mountains, a cedar house perfectly fits in. Actually, it matches very well! And the cedar doesn’t need any maintenance.

Huis in Zwitserland

So, although the warm, sunny summers, and the severe snowy winters, this house will probably be one to go from one generation to the next.