Eurologs again designs a beauty
Click here for an animation in 3D:
De Lage Kempen almost ready
See here a collage of photos of the finish on both the outside and the inside of the building (restaurant) of de Lage Kempen::








Cedar wood in Switzerland
Underneath you will find a photo collection of the building process of one of our cedar wooden houses (Chalets) in Switzerland. The pictures are in chronic order, starting with the sketch design first, followed by the building process and ending with the final result:
The laying of the Foundation and the storey floor:
The building process progressed rapidly:
All sort of transportation was used in order to get the building material high up in the mountains, at the construction site:
Luckily the weather was fine, so the building process of the complete outside of the house only took 2 weeks maximum. After that, we could start finishing the inside.
Working on the roof:
After this, people worked on the inside of the house, and some results were ready to show:
But also on the outside, the walls and roof were finished in order to have a beautiful result:
.
The final actions were taken to decorate the interior of the house, to be ready for living and renting. In springtime 2012 a second Chalet will be built for the same family:
The result looks very nice:
and
and
.
.
Building a house in Almere
Monday, July 3rd 2011 we started with the building of a cedar wood house, that was designed by our client themselves. By the end of June the containers have arrived from Seattle. The foundation for this was made prior to that. The building can start now.
First, we the starting profiles (the first layer) were constructed on the concrete foundation.
After that, the first layer of cedar wood timber was placed on the starting profiles. After this, we stacking can begin.
After the first layer is ready, stacking is ‘child’s play’.
And so it is good to see how the stack work progresses, so that at the end of the day the walls of the ground floor are already built.
During the day, the first living store, became stacked. Below you will find a number of photographs to indicate how fast our pile construction went.
With the patented construction system is actually ‘child’s play ‘ to build your own house.
And in a few days time, your home is built. The picture below gives a good view of the end of the first day of construction:
This photograph also shows what can be achieved in one day:
The first construction day comes successfully to an end. Tomorrow we can start with the second floor.
After a good night sleep, we’ll start building the next floor.
We have worked hard to get everything in the right place.
And the result may be seen. A nice ceiling/floor on which the two layers above the ground floor can be built.
After finishing the first floor, the second and last floor will be constructed. Of course we will start with the deck as well.
We will start with a sort of plastic layer.
On that plastic layer the deck will be finished. In the mean time, all windows and doors will be placed and the house is getting ready.
The balustrades of the roof terrace are fitted. The house can now be completed.
Cedar in Switzerland
Our American supplier builds a second home for a customer in a town called Mürren in Switzerland. In this wonderful, natural surrounding in the Swiss mountains, a cedar house perfectly fits in. Actually, it matches very well! And the cedar doesn’t need any maintenance.
So, although the warm, sunny summers, and the severe snowy winters, this house will probably be one to go from one generation to the next.